To engineer, design, and provide construction monitoring for the build of an earthen-berm freshwater reservoir having the storage capacity of 242k cubic metres. The reservoir had a maximum berm height of 5.55 m and stored 132k cubic metres of water as live storage. These two criteria result in the earthen berm reservoir being designated as a dam.
Unique challenges and how they were overcome: Higher in situ moisture content of the clay soils created difficulty in achieving the compaction specifications. This issue was resolved through targeted engineering controls, specialized soil drying techniques, and comprehensive materials testing during construction. Our team provided full oversight under our engineering services and broader environmental consulting programs to ensure long-term structural integrity and regulatory compliance.
Project Date
March 2020
Location
Grand Prairie County No.1, AB
Service Provided
Engineering design of an earthen berm reservoir complete with berm slope stability assessments, a berm breach and flood inundation study, on-site construction monitoring and quality assurance, and completion of as-built figures and the construction completion report.
Our Projects
Protecting Osprey While Keeping Critical Infrastructure Safe
Protecting Osprey While Keeping Critical Infrastructure Safe
Building from the Ground Up: Geotechnical Insight for Urban Development
Building from the Ground Up: Geotechnical Insight for Urban Development
Uncovering Hidden Hazards Before Renovation
Uncovering Hidden Hazards Before Renovation
Managing Asbestos Safely in an Operating Facility
Managing Asbestos Safely in an Operating Facility
Digging Deeper: A Practical Approach to Complex Site Remediation
Digging Deeper: A Practical Approach to Complex Site Remediation
When Every Hour Matters: Responding to a 700-Litre Diesel Spill
When Every Hour Matters: Responding to a 700-Litre Diesel Spill
Protecting Infrastructure and the Environment from Severe Erosion
Protecting Infrastructure and the Environment from Severe Erosion
Pipeline Release Remediation Project
Pipeline Release Remediation Project
Highway Spill Response & Remediation
Highway Spill Response & Remediation
Mayfair Village Brownfield Redevelopment
Mayfair Village Brownfield Redevelopment
Fox Towers Brownfield Redevelopment
Fox Towers Brownfield Redevelopment
Natural Source Zone Depletion
Natural Source Zone Depletion
Garth Worthington School
Garth Worthington School
Remedial In Situ Injection Program
Remedial In Situ Injection Program
Spill Response – Invermere, BC
Spill Response – Invermere, BC
Spill Response – Wheatland County
Spill Response – Wheatland County
Civil Design
Civil Design
Site Remediation Program
Site Remediation Program
Asbestos Abatement Program
Asbestos Abatement Program
Brownfield Redevelopment Program
Brownfield Redevelopment Program
Environmental Liability Study
Environmental Liability Study
Creek and Slope Restoration
Creek and Slope Restoration
Earthen Berm Water Reservoir Design & Construction Support
Earthen Berm Water Reservoir Design & Construction Support